Install 12 information boards as directed by JohnA who sent this task update.
There will be no whip planting so it will only be the assembly and installation of the remaining 12nr signs. The magnets previously installed have rusted so Jessica is seeking replacements. (They should have been greased/oiled before installation)
7nr signs are stored in a cabin behind the muck heap, (which includes 2nr previously assembled ready for the goat area). The other 4nr signs are in a shelter in the ‘lower middle field’, animals have been in so a bit of brushing down will be required. (I’ll see if these can also be shifted up to the compound)
As before, we will need auger(?) shoveholers, carpentry tools, drills/drivers, post spades, buckets, tamper, spirit levels, and a bow saw to cut down one hedge plant to make space for a sign.
We can have use of ‘The Cabin’ if we so wish.
Kevin will be marking his completion of 7 decades of breathing with “buns” for all.
Park in the main visitor carpark. Trailer will be present.
