This was originally refereed to as Kite’s Croft. It isn’t.
Install post and rail fencing. first 2 of 3 weeks requested here. 5×3″ posts to be driven in with regular post driver, and 10x4cm wooden rails to be nailed on. (As of April 20th posts and 4km of rails have been bought but no site preparation done yet.)
Construction. The earth auger, metal spikes and post drivers will be the main construction tools.
Destruction. We’ll need lump hammers, loppers, hedge trimmers and brush cutter to clear the old fence and light scrub from the work line.
There will be a mixture of removal and rebuilding each week. Nick leading the way.