We have a number of tasks to attempt during 3 days on the farm.
The main one for our first visit will be to make a contribution to the creation of a maze (hedges and paths, 1 way in, 1 way out) in what was the field with play equipment. A contractor will have marked out the layout and laid path material over terram. Our task is to mark the hedge line with intermediate stakes. They have some Hornbeam whips to plant (if we’ve had any rain yet). Bring your hard hat for post driving. Geoff to lead.
Auger on site please.
Days 2 and 3 will be in November and December.
There may be preparation towards the installation of 2 cow scratching posts.
https://www.mayofarmsystems.co.uk/easyswing-cow-brush/ Select the totem pole model
assembly video here (eventually)