Selborne
Hedge laying and clearing tracks for the National Trust. Task leader Rod Hall Refer to venue above for directions
Hedge laying and clearing tracks for the National Trust. Task leader Rod Hall Refer to venue above for directions
Fencing work for National Trust replacing posts and refitting stock fence in a distant Coneycroft field. Task leader is Rod and/or Steve.
Fencing work for National Trust replacing posts and refitting stock fence in a distant Coneycroft field. Task leader is Rod and/or Steve.
Two weeks of work on fences and gateways for local NT man Jim Avenell. Task leader Steve. All to meet in the village car park and await our task assignment. Week 2 will be a different location from the gate work of week 1.
Two weeks of work on fences and gateways for local NT man Jim Avenell. Task leader Steve. All to meet in the village car park and await our task assignment. Week 2 will be a different location from the gate work of week 1.
Fencing repairs along the top path of the Long Lythe at this National Trust site. Task leader Steve or Adey. For week 2 the work request is to continue along the same fence line beyond the stile. There will be considerable scrub clearing required before we can continue with fence repairs. Power tools are likely […]
Fencing repairs along the top path of the Long Lythe at this National Trust site. Task leader Steve or Adey. For week 2 the work request is to continue along the same fence line beyond the stile. There will be considerable scrub clearing required before we can continue with fence repairs. Power tools are likely […]
Two weeks for the National Trust renewing steps up the zig-zag path. We are asked to use sawn oak boards and oak pegs to renew the steps at each turn up the path. Geoff to lead. Week 1. Was a challenge but we finished the work requested shortly after lunch. Week 2. Will be a […]
Two weeks for the National Trust renewing steps up the zig-zag path. We are asked to use sawn oak boards and oak pegs to renew the steps at each turn up the path. Geoff to lead. Week 1. Was a challenge but we finished the work requested shortly after lunch. Week 2. Will be a […]
Work for National Trust at Selborne. Scrub will have been cleared away from the intended fence line. We are to install/reuse standard stock fence with a barbed wire topping. As usual, park behind the pub and transfer tools to NT vehicles then walk left down the main street for 444m to cross the Oakhanger stream […]